High Demand Raw Materials and Finished Products—Six Stacker Cranes, 8,000 Storage Bays, and a Shuttle Warehouse
Customer Overview
A company in a bonded area is working on a shuttle warehouse project. Raw materials and finished products require low-temperature storage, and demand is high.
Project Background
Dual workshops operate simultaneously to meet business needs. Raw materials and finished products require low-temperature storage, and demand is high.
Solution
Six stacker cranes and 8,000 storage spaces are used. A corridor conveyor system is used to connect the workshop and warehouse.
Project Difficulties
Increased production capacity means goods can only be quickly frozen, requiring timely shipment or transfer to a leased warehouse for storage.
Project Value
Raw materials and finished products are handled separately. Production capacity and inventory are increased by at least 100%. Information technology integration between the warehouse and production line is achieved.