9192 pallet positions, solving high cost problems

Customer overview

  • This project solves the problems of high land cost and high warehouse construction cost for customers; in terms of system efficiency, safety, fault tolerance, reducing dependence on staff, improving capacity, and ensuring sustainable high-efficiency operations in the warehouse.


9192 pallet positions, solving high cost problems
Project Background
  • The planned and designed cargo positions are 9192 pallet positions

  • Handling process: automatic palletizing line/manual palletizing → silo elevator.

Solution
  • Selected products: 6 stackers, etc.

  • System configuration: WMS warehouse management system, intelligent and automated hardware-software process

  • Solved the problems of low automation of material storage and insufficient space utilization.


Systems and Equipment to Discover:

Project Difficulties
  • Cooperative docking: requires coordinated docking of conveyor lines and elevators, and low labor efficiency.

  • Cost investment: three shifts, repeated ineffective operations, and rising costs year after year.

  • Flexible logistics: compact site space, does not support secondary transformation of the site environment.

  • Operation efficiency: there is no warehouse information management on site, and the efficiency of picking up and finding goods is slow.

Project value
  • Increase storage capacity by 4.5 times

  • Increase efficiency by 10%

  • Increase timeliness by 8%

  • Reduce 6 workers

  • All-round safety guarantee

We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. Part of the tracking is necessary to ensure SEO effectiveness,
By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept